Speak to a world-class expert now.
1-800-FOR-KKAI (1-800-367-5524)
info@kkai.com
PrimeTrack® Instant Conferencing
PrimeTrack® Project Management System (patent pending)
EXPERTISE AND SERVICES
Engineering Management, Quality Systems Management Consultant, Quality Control Consultant, Engineering Failure Analysis, Accident Investigation, Accident Reconstruction, Specialist, Forensic Analysis Investigation Expert Witness Testimony, Engineering Consulting ServicesPRINCIPAL INDUSTRIES SERVED
Automotive, Aviation, Commercial Transportation, Food Distribution, Metal Casting, Manufacturing, Medical Devices, Railway Transportation
EDUCATION
Master of Engineering Management, University of Utah
B.S. Engineering, Purdue University
PROFESSIONAL EXPERIENCE
Consultant, Kevin Kennedy & Associates, Inc.
Providing engineering management consulting, quality systems management consulting, quality control consulting, failure analysis, forensic engineering and related expertise to a wide variety of clients.
Speak to this experienced, world-class expert now.
For additional or different expertise, browse other top-level expert resumes in Expert Testimony, Failure Analysis, Manufacturing Optimization, KKAI's Center for Rapid Response Engineering® Solutions and a host of other Engineering and Scientific Consulting services.
Learn how KKAI assembles expert teams of any size or skill set combination to meet our clients' needs on a rapid-response basis - no matter how complex the challenge.
Or, peruse our 325 case studies or 475 other expert resumes.
Precision Controls, Portland, OR
Control system projects included developing control system proposals for several companies including a predictive maintenance system for a titanium plant, a water temperature and flow monitoring system for two fish hatcheries and an energy management program for a metal casting facility. Scope of work included documenting the operations, evaluating the capability of the existing control systems to meet future requirements and comparing long-term costs of the alternatives.
Bombardier Transportation, Los Angeles, CA
An expansion and improvement project for a railcar maintenance facility. Scope of work was to evaluate the facility for productivity/quality improvements. Also assisted in the preparation of a competitive bid for a 10-year, approximate $100 million maintenance contract for the MetroLink rapid transit system (Southern California Regional Railroad Authority). Work included assessing the operation to identify ways to immediately improve performance and determine the capability of the existing system to meet future requirements. Recommendations included developing the criteria for an expansion plan for the facility, developing process descriptions to improve work flow, creating objective standards for defect identification and developing a defect reporting system. Client was awarded the new contract for the best-technical, low-cost proposal.
Freightliner Corporation, Memphis, TN
Project Manager for the design, construction and start-up of a 1.1 million Sq.Ft. distribution center for truck parts. Work included overseeing construction of the buildings to assure conformance with architectural and engineering specifications, contractor selection, procurement and installation of office and warehouse equipment, warehouse and office layouts, warehouse process design, initial placement of inventory into the warehouses and management of start-up operations. The finished project included approx. $50 million value in buildings and equipment and over $50 million in inventory. All phases were completed on time and within budget.
Industrial Developments International, Memphis, TN
Project Manager, Owner’s Representative for the specification and construction of a super-flat concrete floor for a 600,000 Sq.Ft. warehouse. Scope of work included preparing material and mix specifications, defining acceptable weather conditions for pouring concrete (humidity, temperature, wind, etc.), site preparation plans, prescribing quality controls, developing concrete pouring and finishing processes and oversight of contractors during construction.
Freightliner Distribution Centers, Atlanta, GA, Bridgeport, NJ, Reno, NV
Project Manager for the rewarehousing of three distribution centers, each approx. 150,000 Sq.Ft. The objective was to redesign the existing warehouses to increase storage capacity, resulting in decreased dependence on outside leased storage space, and to increase material throughput without additional material handling labor. Work included process improvement, facility layout, installation of new storage and material handling equipment, introduction of automated data collection techniques and the strategic relocation of inventory. This effort resulted in a 20% average increase in throughput and a 33% average increase in storage capacity of the facilities.
Freightliner Corporation, Portland, OR
Project Manager for the design and development of a Voice Receiving System to interface with the Warehouse Management System. This system combined voice recognition technology with radio frequency and bar code scanners to allow hands-free input of data from remote locations, streamlining the receiving process. Development of this system combined with new packaging and labeling guidelines resulted in improved data quality, elimination of paperwork, improved inventory accuracy and allowed new inventory to be immediately available for shipment.
Southern Pacific Railroad, Houston, TX
Facilitated a Process Improvement team at the Houston terminal, with a goal of accelerating the throughput of freight cars through the classification yard. A comprehensive analysis identified that locomotives were being delayed due to outdated service and maintenance practices, resulting in yard congestion and delays in train departures. Changes in locomotive maintenance practices were developed, negotiated and implemented, resulting in a significant increase in locomotive availability, reducing dwell time for freight cars through the yard by 50%.
Esterline Technologies, Bellevue, WA
Developed revisions for a painting system for aircraft parts, improving throughput by 100% without additional labor while meeting new environmental regulations. Work included process improvements, modifications of the existing paint booths, installation of an automated material handling system, state-of-art curing ovens and new ventilation equipment.
Designed and implemented a high-speed, low-cost assembly line for medical devices. Scope of work included the design of specialized metal-finishing equipment, development of assembly line processes, packaging and shipping functions, workforce training and safety issues.
ADDITIONAL EXPERIENCE
Please note that this is an abbreviated CV. A fully detailed unabridged CV is available under special circumstances.
Following are links to the resumes of a select few of many KKAI Consultants, Engineers and Experts with related expertise.
Review the resumes below, or enter your search query (type of expertise you are seeking) in the box below, choose to search the entire Rapid-Response site or just resumes, then click the search button. Please note that the list of resumes available online is a select subset of our vast database. If your search of our site does not reveal the expertise you are seeking, please call us toll-free (in the U.S.) at 1-800-367-5524 or contact us for more information and we will gladly assist you in locating the specific expertise you require.
| Engineering Management, Quality Systems Management Consultant, Quality Control Consultant, Engineering Failure Analysis, Accident Investigation, Accident Reconstruction, Specialist, Forensic Analysis Investigation Expert Witness Testimony, Engineering Consulting Services | |
| Resume of SPC | mechanical engineer, control systems consultant, engineering consultant, engineering failure analysis, specialist, forensic analysis investigation expert witness testimony, engineering consulting services |
| Resume of KPH | electrical design engineer, nuclear engineer, engineering manager, program manager, project engineer, marketing and financial consultant, accident investigation, accident reconstruction, specialist, forensic analysis investigation expert witness testimony, engineering consulting services |
Have an urgent litigation support or engineering and scientific consulting need? Contact KKAI now for world-class, expert rapid response.
1-800-FOR-KKAI (1-800-367-5524)
info@kkai.com
BACK TO THE TOP OF THIS PAGE
Kevin Kennedy & Associates, Inc.
Rapid Response Engineering® Solutions
3905 Vincennes Road, Suite 320
Indianapolis, Indiana 46268
(317) 536-7000 voice
(317) 536-7220 fax