Speak to a world-class expert now.
1-800-FOR-KKAI (1-800-367-5524)
info@kkai.com
PrimeTrack® Instant Conferencing
PrimeTrack® Project Management System (patent pending)


LITIGATION SUPPORT SERVICES


CENTER FOR RAPID RESPONSE ENGINEERING® SOLUTIONS

ENGINEERING AND SCIENTIFIC CONSULTING SERVICES

RAM Analysis of a Moderate Sized Chemical Plant

Consultant
ZCO is a Mechanical Engineer, Locomotive Reliability and Quality Consultant, Reliability and Maintenance Consultant with world-class expertise in plant operations, maintenance, engineering and reliability management in the refining and chemical industry.

Speak to this experienced, world-class expert now.

For additional or different expertise, browse other top-level expert resumes in Expert Testimony, Failure Analysis, Manufacturing Optimization, KKAI's Center for Rapid Response Engineering® Solutions and a host of other Engineering and Scientific Consulting services.

Learn how KKAI assembles expert teams of any size or skill set combination to meet our clients' needs on a rapid-response basis - no matter how complex the challenge.

Or, peruse our 400 case studies or 500 other expert resumes.


Search Entire Rapid-Response Site
Search Resumes Only
Case Studies

Recently, there was a request for a "reliability analysis" of a moderate sized chemical plant. The situation was one in which the plant was in a "sold out" position and more product could be sold if it could be made.

Plant management viewed "reliability" as the primary barrier to increased production. During the initial discussions, plant representatives described elements of reliability, availability and maintainability as the issues they grouped under the single heading "reliability" where they had concerns. As a result, a comprehensive RAM (reliability, availability, maintainability) analysis was recommended.

The analysis found that there were some opportunities associated with "reliability" problems. A number of pieces of unspared plant equipment had marginal reliability that allowed random and not infrequent failures. When combined, the overall plant experienced frequent outages. Considering the amount of time needed to make repairs and bring the plant back on line and product on specification, these outages cost a significant amount of production.

Analysis of availability showed that a significant portion of down time resulted from scheduled outages for maintenance and internal inspection. Availability loss to scheduled outages is controlled by two factors.

The first factor(s) can be best described as "run-limiters". Run-limiters are systems or devices that determine how long a plant can operate without a shutdown. In some cases, maximum run-length is determined by regulatory limits (e.g. annual boiler inspections). In other situations, the wear and tear on a single component sets the run-length. In these cases, steps can be taken to make the run-limiting device more robust to allow longer runs between outages.

The second factor that controls availability loss due to scheduled outages is the "duration-setter(s)" or the system of device that determines how long the outage will last. Here a variety of approaches are available for reducing the critical path duration of the outage, But one must always be sensitive to the fact that there are frequently a number of near-critical work paths and to make sure that all competing paths have been addressed.

Finally, maintainability is an area that frequently escapes review but often provides an opportunity for improvement. Maintainability is defined as a measure of the ability to restore inherent reliability in a ratable period of time. While dedicated craftsmen frequently work until their product is reliable, their work plan is frequently not ratable (meaning that the work cannot be completed in a specified period). It is possible to make all work ratable by moving uncontrollable tasks outside the outage period. In one example, you replace the complete system during the outage and rebuild the removed system at your leisure once the outage is over.

Selectively addressing the least costly opportunities in each area can significantly increase unit output with a small investment by:

Read other articles by this KKAI Associate:

Project Readiness - CPM Review

Root Cause Analysis of Hydrogen Compressor Failure

Application of Reliability Block Diagram Analysis to Overall Plant Configuration

Fixing Responsibility for Project Delays Due to Weld Defects

Mapping from Failure to Successful Repair in a High Volume Environment

Mechanical Engineer, Locomotive Reliability and Quality Consultant, Reliability and Maintenance Consultant, plant operations, maintenance, engineering and reliability management in the refining and chemical industry.
Resume of YEU nuclear safety expert consultant
Resume of EJL reliability, maintainability, failure analysis expert consultant
Resume of GEF value analysis, value engineering, expert consultant
Resume of CYV chemical, operations, process, manufacturing expert consultant

To search for specific expertise, enter your search query (type of expertise you are seeking) in the box below, choose to search the entire Rapid-Response site or just resumes and brochures, then click the search button. Please note that the list of resumes available online is a select subset of our vast database. If your search of our site does not reveal the expertise you are seeking, please call us toll-free (in the U.S.) at 1-800-367-5524 or contact us for more information and we will gladly assist you in locating the specific expertise you require.


Search Entire Rapid-Response Site
Search Resumes Only
Case Studies


Have an urgent litigation support or engineering and scientific consulting need? Contact KKAI now for world-class, expert rapid response.

1-800-FOR-KKAI (1-800-367-5524)
info@kkai.com

BACK TO THE TOP OF THIS PAGE
Kevin Kennedy & Associates, Inc.
Rapid Response Engineering® Solutions
3905 Vincennes Road, Suite 320
Indianapolis, Indiana 46268
(317) 536-7000 voice
(317) 536-7220 fax

SEARCH our site

Search Entire Site
Resumes Only
Case Studies

Our innovative, proprietary and patent-pending PrimeTrack® Rapid Response capabilities can help you quickly find the experts you are looking for.

Search here to examine any of the more than 500 resumes for KKAI lead consultants and associated experts from our global organization.

Simply enter the type of expertise you seek, and then choose to search the entire Rapid Response site, to just read resumes only, or to read any of KKAI's more than 400 case studies. A rapidly growing organization, KKAI adds more than 20 expert resumes and 40 expert case studies to its Web site each month, so check back often.


CALL US TODAY
Call KKAI with an urgent need. Experts are paged instantaneously and can be made available in a virtual conference room. To experience this unique capability, please call us at 1-800-FOR-KKAI (1-800-367-5524) from the United States or 317-536-7000 if calling internationally.